Middle School capacity and BUC building scenarios

A starting structure that connects the choices to the evidence already collected and makes the missing decision evidence visible.

Why these two decisions appear together

Separate choices

Middle School capacity and BUC building use are different service and asset decisions.

Shared constraints

They may compete for cash, debt capacity, operating room, staff, timing, and capital-program attention.

Same discipline

Each alternative needs purpose, baseline, scope, complete cost, funding, service and community effects, legal path, transition, timing, and ownership.

Wilbraham Middle School

Working decision trigger: the school is reported as over capacity. The current database does not yet contain official rated capacity, functional program capacity, or room utilization, so the degree of over-capacity is not yet verified here.
MeasurePeriodValueStatusDecision use
Middle School Enrollment2024-10-01613Source ReportedSchool-level enrollment point; it is not a capacity measure.
Middle School Projected EnrollmentAY2025-26614Source ProjectedNear-term projection; it is not a capacity measure.
Rated Design CapacityCURRENTNot loadedNot LoadedNeeded to calculate enrollment ÷ rated capacity.
Functional Program CapacityCURRENTNot loadedNot LoadedNeeded because special programs, room types, scheduling, and grade configuration may constrain usable capacity before a design limit is reached.
Room And Schedule UtilizationCURRENTNot loadedNot LoadedNeeded to identify where and when crowding occurs.
Enrollment By Grade And Multiyear ForecastCURRENT_AND_FUTURENot loadedNot LoadedNeeded to size and time a durable response rather than react to one total.
AssetParcelReported acres2021 square feet2021 critical2021 non-critical2021 reported deferred2021 ten-year inflatedFY2027 Town allocationQA exceptions
Wilbraham Middle School487463.12099,750$38,419$102,564$140,983$1,010,638Not explicitly allocated0
The 2021 capital-needs assessment is condition and planning evidence. It is not a capacity study, current project scope, or current estimate.

BUC working scenarios

CodePreserved working scenarioExplicitly named assetsEvidence needed to compare
BUC-01Consolidate into Memorial School; sell Town Hall, Little Red Schoolhouse, and the former Police/IT building.Memorial School; Town Hall; Little Red School House; Former Police / IT BuildingConsolidation design; functions and occupants moving; renovation and transition work; service continuity; legal and property restrictions; sale authority, timing, and net proceeds; recurring operating change.
BUC-02Maintain current approach with improvements.Current BUC building arrangement; exact improvement list not loadedCurrent use, condition, utilization, accessibility, safety, service delivery, full operating cost, improvement scope, funding, sequencing, and retained flexibility for each building.
BUC-03Sell Memorial School; evaluate redevelopment of some properties.Memorial School; other properties are not yet specifically identifiedFunctions displaced; replacement locations; legal and property restrictions; redevelopment criteria; community and service effects; transition cost; timing; proceeds; meaning of “some properties.”
BUC-04Reimagine Memorial as community center.Memorial SchoolProgram and service model; users; occupancy and code needs; renovation scope; operating owner; staffing; annual cost and revenue; other building effects; implementation phases; measures of community value.
$1,558,190

2021 reported deferred maintenance across four BUC assets.

$453,115

Separate original 2022–2031 inflated projection.

$768,400

Partial FY2027 explicit facility allocations across three assets.

AssetParcelReported acres2021 square feet2021 critical2021 non-critical2021 reported deferred2021 ten-year inflatedFY2027 explicit allocationQA exceptions
Memorial School273339.99748,895$24,002$1,274,063$1,298,066$203,551$500,0002
Town Hall45614.80911,446$46,591$176,908$223,499$105,859$53,7500
Little Red School House45100.7922,840$6,250$6,854$19,354$59,191$214,6501
Former Police / IT Building26520.7503,193$5,000$7,271$17,271$84,514Not explicitly allocated1

What the connected data changes

The database does not choose a building outcome. It improves the story by connecting school context, Town asset responsibility, capital history, scenario execution requirements, and financing—and by showing where the choices are not yet ready for financial comparison.

2,890 → 2,836 → 2,830

District enrollment from 2021–22 to 2025–26, then projected 2026–27. This does not disprove school-level crowding; it directs attention to local grade, program, room, and schedule evidence.

$1,558,190

2021 reported deferred maintenance across the four BUC assets; Memorial accounts for 83.3%.

$9,007,964

Senior Center permanent scheduled debt service: principal plus contractual interest. It demonstrates why project price alone is not complete cost.

WMS ownership and allocation: Lease of Wilbraham elementary/middle school buildings facilities and grounds; One dollar; term not to exceed twenty years; renewed July 1 2015. The loaded rule says: “Capital outlay for leased elementary and middle schools is assessed only to the town where the building is located.” Rated capacity, functional capacity, room utilization, and enrollment by grade remain not loaded.

Scenario readiness, not a financial ranking

Scenario familyWorking variantRoleUnresolved functionsUnresolved blockersRecorded risksFinancial readiness
Option 1 - Consolidate municipal functions at MemorialOption 1B - Developer-owned leasebackWorking change344Lease economics unspecified
Option 1 - Consolidate municipal functions at MemorialOption 1A - Town-owned consolidationWorking change340Only the 30-year horizon is populated
Option 2 - Maintain current arrangementOption 2A - Current arrangementCurrent baseline000Complete cost of keeping is not loaded
Option 3 - Sell or redevelop MemorialOption 3A - Memorial dispositionWorking change300Only the 30-year horizon is populated
Option 4 - Reimagine Memorial as a community centerOption 4B - Developer-owned community-center leasebackWorking change303Lease economics unspecified
Option 4 - Reimagine Memorial as a community centerOption 4A - Town-owned community centerWorking change300Only the 30-year horizon is populated

Unresolved Memorial functions

  • Wrestling program
  • Pickleball
  • Other Memorial recreation functions

Potentially blocking Option 1 requirements

  • Protect Senior Center access before Town Hall disposition
  • LRS pond and wetland due diligence
  • LRS Article 97 determination
  • LRS deed and title clearance

Missing economics

Only the 30-year horizon is populated. Sale proceeds, renovation cost, rent/revenue, tax and housing effects, delay/carrying cost, and clearance cost are not.

Do not interpret zero recorded blockers or risks as “risk-free.” The current-arrangement baseline still lacks a complete cost of keeping. The two developer-leaseback records also leave their economic terms unspecified.

Full connected-data view · Asset actions · Execution requirements · Risks · Scenario values

Evidence boundaries and next inputs

Asset evidence CSV · BUC scenario register · Middle School capacity evidence · Coverage and boundaries