CSKE WHOLE-PICTURE TOWN DECISION GUIDE v0.3.6 MIDDLE SCHOOL AND BUC DECISION-CASE INTEGRATION 2026-08-14 This release removes the named-role audience subtitle and adds a focused, non-recommendation decision structure for: 1. the reported Wilbraham Middle School capacity problem; and 2. the four preserved Building Utilization Committee working scenarios. The integration validates and publishes asset-specific parcel, 2021 capital- needs, QA-exception, and partial FY2027 facility-allocation evidence for Wilbraham Middle School, Memorial School, Town Hall, Little Red School House, and the Former Police / IT Building. The Middle School view does not assert a verified capacity ratio. Collected District evidence reports enrollment of 613 on October 1, 2024 and projects 614 for 2025-26, but rated capacity, functional program capacity, room utilization, enrollment by grade, and a current multi-year forecast are not loaded in the reporting extract. The 2021 assessment remains point-in-time evidence. Its measures are not current prices, current condition, approved work, actual spending, or proof that work remains open. Deferred maintenance and ten-year projections may overlap and are not added together. Partial facility allocations are not complete ownership cost or scenario savings.